State Unitary Enterprise

Yesterday

The Tajik aluminum plant was built by the whole Soviet country. The building was considered the pride of the country. The building complex included several major objects of the country - Nurek Hydro Power Plant, the largest in Central Asia, the Tajik Aluminum Plant, Vakhsh Nitrogen Fertilizer Plant, Javan Chemical Plant, Dushanbe Cement Plant and others. Power station generated electric energy and the aluminum plant produced metal that met the requirements of domestic industry, strengthening, thus, the country's economy and defense. The complex, which was later named as the South Tajik Territorial-Production Complex, became a basis of socio-economic development of the country.

Chronicle of events:

  • October 1964, at an enlarged meeting of the Council of Ministers of the Tajik Soviet Socialist Republic, the construction project of Tajik aluminum plant was adopted and recommended to be for approved by Sredazsovnarhoz.
  • 31 March 1965, the first volume of civil and erection works was executed. It was a sign for the construction of the Tajik aluminum plant, and that day became the start-up of TadAz.
  • June 7, 1965, the Construction Agency of the Tajik Aluminum Plant «Aluminstroy» was created.
  • 1967, the Union Aluminum-Magnesium Institute (UAMI) sent to the USSR Ministry of Metallurgy a proposal to revise the designing and building of new smelters. After the application the USSR aluminum industry changed the direction of its development and switched over to the use of electrolyzes with prebaked anodes of high power. The first enterprise that put the new technology into practice was the Tajik Aluminum Plant.
  • 1976, experts of the French company «Aluminum Pechiney» came to Tajikistan to guide the assembly operations and run in a prebaked anode shop.
  • 1976, an auxiliary site for prebaked anode shop was turned over for operation and the production of «green» anode started.
  • January 20, 1978, the first pre-baked anode was produced and in September of that year it was signed the act of creating the first production line of baked anode.
  • 1978, TadAz preliminary design was updated. According to the joint Soviet-French project suggested by UAMI and «Aluminum Pechiney» the first shop of baked anodes was built.
  • 1978, the 6th plant building brought into service.
  • 1978, the construction of bicycle assembling shop was completed.
  • 1979, the 7th plant building brought into service.
  • 1979, the second stage of prebaked anodes production line started its operating.
  • 1980, the 8th and 9th brought into service.
  • 1980, the third stage of prebaked anodes production line began to work.
  • 1981, the 10th plant building brought into service.
  • 1981, 11th and 12th production buildings were partially put into operation (the construction works were started in January of 1980 and were completed after 48 months in 1983).
  • 1982, the company «StroyInstrument» passed into submission of TadAz.
  • 1982, commissioned the southern sides of 11th and 12th buildings were finished (the construction works started in 1980 and were fully completed in 1984).
  • 1987, the second electrolysis shop was put into operation (construction and installation works continued for 48 months - from January 1984 to December 1987).
  • 1987, the construction of the 1st building was finished (the works went on from 1986 to 1989).
  • 1987, the shop of consumer goods was built.
  • 1988, the output of aluminum reached an all-time high - 457 thousands of tons (this production rate was sustained until 1990).
  • 1989, the construction of TadAz was fully completed.
  • 1989, the first consumer goods were released by the plant.
  • 1989, the plant signed a contract with the German company «Olkusz» on production of Teflon products.
  • 1990, a metal ware shop was created at the plant.
  • 1991, the first aluminum profile was made at the press shop of the plant.
  • 1991, a crucial period for TadAz associated with political crisis in Tajikistan, the plant endured serious troubles, there was a sharp drop in its technical and economic parameters (the output decreased from year to year and in 1997 it was only 180 thousands of tons).
  • 1992, the plant together with the Switzerland firm «Suisse» produced  TV set «Solfra».
  • 1992, the production of automobile wheels was founded at the plant.
  • 1992, the metal ware shop produced its first product - aluminum doors and windows.
  • 1993, the 4th block of roasting shop began operating.
  • 1993, aluminum rolling shop was organized at the plant.
  • 1993, the company «Stroymontazh» entered the plant and organized an overhaul shop on its base.
  • 1995, the 20th anniversary of TadAz, the event was attended by President of the country Emomali Rahmon.
  • 1995, the aluminum sheet metal shop released its first production.
  • 1996, the plant was awarded with «Golden Globe» for successful activity.
  • 1996, aluminum products management was organized under the metal ware shop and consumer goods shop.
  • 1998, the increase in the output of metal started and a way out of the crisis arising from the disruption of the supply of raw materials began to show.
  • 2004, the barter system was replaced by a new economic relationship with new partners: goods made on commission were processed and exported under customs control (tolling).
  • 2006, the plant reached a long-term agreement with Norwegian company «Hydro Aluminium» in supplying of alumina, selling aluminum, rendering technical assistance to improve the production efficiency and safety, health and environment.
  • 2007, the Tajik Aluminum Plant (TadAz) was officially renamed to the State Unitary Enterprise «Tajik Aluminum Company» (TALCO). Rebranding of the company was done to strengthen and improve the image of aluminum industry of Tajikistan in the international arena, and continue the structural reforms initiated at the plant. The renaming was fixed by correspondent governmental decision, signed by President Emomali Rahmon on April 3, 2007.